CV_Sintetico_FB_2019_11 Bologna, BO, Italia

Kan være tilgjengelig

(Oppdatert %updatedDate %)

CV_Sintetico_FB_2019_11

Bologna, BO, Italia

Innfødt Italian, Mellomliggende English

  • Team Leader
  • Project Manager
  • Safety

Ferdigheter (42)

DOCUMENTAZIONE

OTTIMIZZAZIONE

REAL TIME

ENCODER

PRIMAVERA

CAPACITÀ DI LEADERSHIP

VALUTAZIONE

FATTIBILITÀ

Project

ADA

STUDI DI FATTIBILITÀ

VALIDAZIONE DEL SOFTWARE

Lead

TEST PLAN

Test

IMPLEMENTAZIONE

Manager

HMI

MACCHINE AUTOMATICHE

INTERFACCIA UOMO-MACCHINA

IN AMBITO AUTOMOTIVE

VISIO

ISO

SENSORI

FMEA

FPGA

PERITO

ALTA

RAGGI X

C++

CISQ

PROTOTIPI

Pascal

VISUAL AUTOMOBILISTICO

backend

PROTOTIPO

DELPHI

ALTA PRECISIONE

Oracle

PMO

SALDATURA

PREVISIONE

Arbeidserfaring

Safety Manager for the project
Train (Railway)

2022-01 - Nåværende

ACTIVITIES Collaboration in the design of the train, especially for the safety aspects and PERFORMED test aspect; groups: doors, brakes, conditioning, fire and smoke prevention Collaboration in realization of designs of Safety System Starting from the PHIA and running with the verifications of each single function and group and PR management DATA 2020÷Today PROJECT V&V of Milano-Chiasso update (Railway) ACTIVITIES Verification of the position of signals and Information Point (Balise, Light PERFORMED signals, and so on), verification of the information of the devices and the telegrams to be transmitted from balise to the trains. Several phases.
Functional Safety Manager of On Board Charger
On Board Charger (Automotive)

2020-01 - 2021-01

(Automotive)
Functional Safety Manager
level) (Automotive)

2016-01 - 2017-01

of a sensor (ADBlue, level) (Automotive) ACTIVITIES Implementation of the design and verification process according to ISO PERFORMED 26262 standards, verification of safety aspects, of the V&V document verification plan.
DATA 2016÷2019 PROJECT Payment System (Toll of highway system, tram, bus) ACTIVITIES The system for highway consist of hardware (electronics and mechanical) PERFORMED and software: o device to receive money (card, coins and paper), give the rest (coins and paper), print receipt and memorize information / transmit to remote o Requirements definition, test description, test report (FAT), CR management o System to check the devices on field, remote controls o Analysis of Log to detect errors (examination of the rest of the payment, the coins inserted in, and so on) (SAT); CR management DATA 2012 PROJECT Development of device to test Temperature (RTB system, Railway) (Rilevamento Termico Boccole dei rotabili / Hot Box Detection System) ACTIVITIES As safety manager I developed the entire life cycle of the device, starting PERFORMED from the customer's specifications up to the installation and verification in the field; Safety Case. The system use "Electronic Rail Contacts (pedals)" and "Scanning modules" using infrared sensor to send data to a SIL4 device to elaborate data. If an alarm is elapsed it is forwarded to the central station.
I helped in Hardware and Software requirements and design.
DATA 2010 PROJECT Development and installation of MGD (Railway) (Modulo Gestione Deviatoi / Module to manage the switch point) ACTIVITIES As Project manager I developed the entire life cycle of the device, starting PERFORMED from the customer's specifications up to the installation in the field and verification. The device has the actuation parts realized in safety level SIL4.
I helped in Hardware and Software requirements and module design, I realized the software of the system, tested it and realized the Test Design and Report. I realized also the system to test the device (HW, SW).
DATA 2007 PROJECT Development of SMIC (Railway) (Sensore Misura Isolamento Cavi - Sensor to verify cable insulation) ACTIVITIES Development of the sensor starting from the customer's specifications up to PERFORMED the production of devices. Realization according the norms.
Development of the Test System to verify the SMIC functions.
On Board Charger
Embedded Software verification

2012-01 - 2012-01

ACTIVITIES Verification of the entire project life cycle of an On Board Charger. Help in PERFORMED making documents. Work in the team to discuss the safety aspect, their countermeasures and safety requirements.
Embedded Software verification, coding standard definition (based on MISRA C: 2012); CR management Use of high level microprocessor and implementing safety procedures (i.e: Infineon AURIX TC3xx, according his Safety Manual) DATA 2019 PROJECT Test of On Board System of a Train (POP) (Railway) (POP Train, Alstom Germany) ACTIVITIES Verification of some function of the SW of the Train POP, test, SW PERFORMED requirements verification, Verification of test description; Verification of SW test description; Change management; Safety Case DATA 2018 PROJECT V&V of S-HMI and ICONIS (Railway) (Secure Human Machine Interface - Alstom) ACTIVITIES Verification and validation of the software of system that is the full PERFORMED Integrated Control & Security Centre, and represents the Alstom solution for the Traffic Management System (TMS), used in Railway, Mass transit and Railroad applications. ICONIS consists of a set of SW modules designed to control and supervise stations or railway lines of various sizes, using diagrams or principle schema of different types.
Activity: Requirements verification, SW requirements verification, Verification of test description; Verification of SW test description; CR mng; Safety Case
V&V of Alstom devices (ACC, SCMT, ERTMS) (Railway)

2000-01 - 2006-01

PROJECT V&V of Alstom devices (ACC, SCMT, ERTMS) (Railway) (Alstom) ACTIVITIES Verification and validation of the systems PERFORMED Activity: Requirements verification, SW requirements verification, realization of Test Description, Execution of Test and Report, Verification of test description; realization of SW Test Description, Verification of SW test description; Safety Case.
R&D Electronic & Mechanic Manager (Industry)
Tobacco division; now in Coesia Group

1989-01 - 1999-01

ACTIVITIES Technical manager (team of about 40 employees) for the design of high- PERFORMED speed automatic machines, from the creation of the cigarettes to the end of the line, including the formation of boxes and palletizing.
The office realized new machine for automatic cigarettes machines: o cigarette making machines o Fully automatic Filter rod making o flow and hinge lid packing (package realization) o cellophaning machines (wrapping the package) o sticking machines (set of packages) o case packers o palletizers o special sensor ● system controlling the consistency of the cigarettes' tip ● system controlling the ventilation of the cigarettes ● system controlling the quality of pack (tear tape position, stamp position, etc.)
Founders Partner (Industry)
Boconsult SrL

1983-01 - 1989-01

ACTIVITIES Technical manager for the design of automation systems, parking system, PERFORMED highway toll payment
R&D Manager (Industry)
SIAP SrL

1973-01 - 1982-01

ACTIVITIES Technical manager for the design of environmental sensors PERFORMED (temperature, humidity, wind speed, wind direction and gust, rain, snow); Transmission and data collection.
Systems for military aeronautics, Civil Engineering, private companies.
Realization of a board (microprocessor emulation) with bitslice emulating a 16 bit microprocessor inserting new macro instructions (operating system) Realization of Pascal Like compiler.

Kontakt konsulent

/